Overrides to Labor and Material Costs
QuoteSoft Duct allows the user to Override Labor and Material Costs during the Takeoff process. These Overrides will be stored as the new value for the item taken off.
How to use the Overrides
- Within Takeoff click the Overrides button on the top of the Item Details palette
- Input the Override value desired or override by a percentage factor
- Click Save Changes to have the override applied
- The overridden fields will be highlighted yellow
©2022 ConstructConnect, Inc. All rights reserved.