G. Data File - Turning Vanes
Turning vanes and rail information whether fabricated or purchased will need to be input. The program will use the costs and labor factors to calculate the needed material and labor.
There is no limit to the number of turning vanes that can be setup in the program.
Click New, Edit or Duplicate to modify turning vane information.
Turning Vane Setup
Name – the name of the Turning Vane assembly
Rail Cost – enter the cost per foot for the rail portion
Rail Scrap % - the scrap percentage you want included in the calculation of the feet needed for the rail length.
Spacing Inches – distance between vanes
Vane Cost – enter the cost per foot of the vane portion
Vane Scrap % - the scrap percentage you want included in the calculation of the feet needed for the vanes total.
Base Labor – the labor hours to start with for vane fabrication
Labor +12 – the amount the labor should increase by for every additional 12 inches of semi perimeter.
Rail and Vane Lbs – the weight of the turning vane components
©2022 ConstructConnect, Inc. All rights reserved.