Electrical Engineers |  Handle design of a building’s eletcrical systems and components. |
Engineer | (aka Professional Engineer) One who is professionally engaged in a branch of engineering. |
Engineer’s Estimate |  Construction cost estimate for a project as calculated by an engineer. |
Enterprise Resource Planning (ERP) | Â Refers to software packages, such as Microsoft Dynamics GP, Dynamics NAV or Netsuite software that, among other things, manages the GL. |
Escalation | A percentage value applied to Material and Labor costs to account for future cost increases for when a project is built |
Estimate |
|
Estimate of Construction Cost, Detailed | A calculation of costs prepared on the basis of a detailed analysis of materials and labor for all items of work, as contrasted with an estimate based on current area, volume or similar unit costs. |
Estimating | A process of calculating the amount of material, labor and equipment required for a given project necessary to complete the work as specified. |
EULA | End User License Agreement - the contract between you and us explaining how you may use the software license you purchased. |