Duct 4.1.4 Release Notes (09/06/2022)

Improvements/Enhancements

  • Improved Takeoff loading times (up to 42% faster)

  • Improve performance when calculating job totals (up to 60% faster!)

  • Exiting Takeoff is significantly faster (up to 85% faster!!!)

  • Display a “Please wait” indicator when closing Takeoff

  • Move replacing plan file from the ribbon to the Zone Edit window

  • Support special characters in QuoteSoft and SQL passwords

  • Support negative values in Global Edit

  • Install Factor % field in Audit Trail displays 0 when not used

  • Ability to add 50 items to a Catalog

Bug Fixes

  • Corrected a few issues with Morph items including:

    • Sizing and components not carrying over to next item

    • Placing a newly created assembly that contains morph items into a zone caused crash

    • Imported Takeoff job creates morph items incorrectly

    • Unnecessary items are shown in the AT when a zone containing morph items is copied

  • Program locking up when switching zones in Takeoff

  • Deleting catalog items in Central Data cause errors in takeoff bookmarks

  • Factors and override prompt not populating when creating a zone inside takeoff

  • Catalog items with multiple sizes cause size boxes to overlap in image palette

  • Removing Seams from Fittings causes an error when placing Duct

  • R11 item detail values change during Takeoff

  • Cannot reorder pick-list in custom fields

  • Scope info (Subzone, System, Area, Phase) retaining when accepting an item

  • Workstation pallets improvements

  • Zone list not highlighted in takeoff

  • Copying a Job or Zone

 

©2022 ConstructConnect, Inc. All rights reserved.